Washington State University Martin Stadium

Washington State University Martin Stadium

“I’ve got to tell you, the construction of Martin Stadium has been flawless. It really has been. And again, I attribute that and credit a lot of people. What we’re seeing here today is really something very special.”

Bill Moos as quoted in the Spokesman Review

 

Bringing a World-Class Stadium to the Palouse: Engineering a cutting edge facility for Washington State University

DCI Engineers provided structural engineering for this $65M expansion to the existing football stadium. This project needed to be completed in one off-season, allowing less than 10 months from construction start to the opening football game and features include new club seating and amenity spaces, luxury boxes, and a new press box.
 
Project Highlights

  • Structural steel was ordered and detailing begun while the architectural design was less than 50% complete. This involved an extraordinary team effort between DCI and the steel fabricator.
  • The new structure was built over an existing plaza and information technology building, and utilized those existing elements for the structural support of the new building.
  • Stadium includes 1,900 premium seats, 21 suites, 44 loge boxes, and 1,300 club seats.

Awards/News

ENR Best Specialty Contracting Project - WSU Martin Stadium Renovation

Location: 
Pullman, Washington
Primary Material: 
Concrete
Steel
Type: 
Structural
Sector: 
Education
Sports & Recreation

Social Profiles