AVISTA STOPLOG HANDLING CRANE

Lifts and Cranes: 15-ton crane assemblies maintain hydraulic power

The hydraulic dams at Cabinet Gorge and Noxon Rapids comprise of eight stoplog units per dam to isolate and dewater spillway gates. DCI Engineers was selected by the client to conduct a preliminary review of the existing tread loading and pipeline tractor stability. The facility owners chose a new 15-ton lifting mechanism for removing and installing stoplogs. DCI developed preliminary general assembly and hoisting framework fabrication drawings which detailed weldment and connections of the stoplog crane. The engineers also developed a crane installation manual.

Location Pin Icon
Location:
Clark Fork, Idaho & Noxon, Montana
Geometric Shapes Icon
Service:
Industrial
Pie Chart Icon
Industries:
Industrial
Material Shapes Icon
Primary Material:
Steel

Project Highlights

  • New crane systems help with routine maintenance service at both facilities.

Latest work

See all
Dameron Architecture Empirefirehouse2
project

Empire Engine House

0120 110 Madison 20140627 100311
project

110 Madison

Baumberger Studio Final 2022 0321
project

Timberview VIII