A Transcendent Sanctuary: Washington’s largest CLT installation

You never would guess the new home for the Bellevue First Congregational Church is a refurbished 1970s-era office building. The occupancy-change design extended the building envelope for a new building shell, and made room in the two-story sanctuary for the largest cross-laminated timber (CLT) installation in Washington state. DCI engineered the steel connections for the 40-foot tall panels, which are the altar’s expansive backdrop.

The firm also oversaw the building’s seismic upgrade efforts, framing, lateral systems, and deeper foundation design. The team also accounted for the building load to nearby underground detention vaults.

Location Pin Icon
Location:
Bellevue, Washington
Cube Measurments Icon
Square Feet:
49,000
Building Icon
Stories:
2
Geometric Shapes Icon
Service:
Structural, Civil
Pie Chart Icon
Industries:
PK-12, Mass Timber, Religious
Material Shapes Icon
Primary Material:
Steel, Masonry, Wood

Project Highlights

  • Created a modern spiritual place of worship by delivering a high-ceiling sanctuary and humanizing space.
  • Hoisted and installed seventeen interior CLT panels (8 feet wide x 40 feet high x 4 inches thick) using winches, pulleys, and scissor lifts.
  • Renovation brought in more natural light into the interior spaces.
  • Renovation also brought the building up to the latest seismic codes.

Latest work

See all
Mari Bellevue MUST CREDIT MZA 3
project

Mari Bellevue

Spokane Co Small Arms Range Final 24
project

Spokane County Small Arms Range & Training Facility

HIPLA Marlin Equity 230927 03 MUST Credit Gensler 7 web
project

1301 Manhattan