Work

Claremont McKenna College Soll Center

Breaking Open Opportunity: A look at renovations for CMC’s Soll Center for Student Opportunity

DCI Engineers was tasked with designing the structural changes to the student career center at Claremont McKenna College, which included expanding the reception area by removing much of the west and south facades of the first level.

Location Pin Icon
Location:
Claremont, California
Cube Measurments Icon
Square Feet:
3,945
Building Icon
Stories:
2
Geometric Shapes Icon
Service:
Structural
Pie Chart Icon
Industries:
Higher Education
Material Shapes Icon
Primary Material:
Concrete, Steel

Project Highlights

  • Architectural requirements included minimal elevation for the structural members, so DCI was challenged to strengthen the long span of the storefront without using larger steel members. As a result, a steel plate below the cut concrete girder was used.
  • One challenge was to keep the integrity of the seismic resistance for the building while removing much of the west and south concrete wall. DCI was able to make the new design connection work, despite the high load connection between the new steel member and new concrete wall.

Latest work

See all
Dameron Architecture Empirefirehouse2
project

Empire Engine House

0120 110 Madison 20140627 100311
project

110 Madison

Baumberger Studio Final 2022 0321
project

Timberview VIII