Grab the Guitar: Gibson’s acoustic “craftory” doubles in size

Since 1987, Gibson has taken advantage of Bozeman, Montana’s relatively stable and dry climate to build their flat-top acoustic guitars. In Fall 2022, they expanded those efforts by expanding the production facility itself – now, with double the space.

Location Pin Icon
Location:
Bozeman, Montana
Cube Measurments Icon
Area:
48,225-sf
Building Icon
Size:
2 stories
Geometric Shapes Icon
Service:
Structural
Pie Chart Icon
Industries:
Commercial, Industrial
Material Shapes Icon
Primary Material:
Steel

The renovation delivered a larger machine shop, a new showroom, and an overall more modernized facility. DCI’s structural support included an over-built roof platform, which minimizes snow drift while avoiding a large-scale retrofit.

Project Highlights

  • Custom conveyor system runs throughout the entire manufacturing space.
  • Operations had to be continuous during construction, which played into the design approach at the interfaces and within the existing building.

Latest work

See all
Milwaukee Station2025 14
project

The Station Lofts

Katy Trail Condos 4 MUST CREDIT Chase Daniels medium
project

The Terminal at Katy Trail

Knox District Rendering
project

Knox Street