Modernizing the Spokane River’s East Bank: Providing services for a 17-acre corporate office park master plan

The 17-acre commercial/light industrial Iron Bridge Corporate Park in Spokane, Washington is located along the east bank of the Spokane River between the Gonzaga University Campus and the University District. DCI Engineers provided civil and structural design for these two-story office buildings, as well as other campus buildings at this location.

Location Pin Icon
Location:
Spokane, Washington
Cube Measurments Icon
Area:
740,520-sf
Building Icon
Size:
2 stories
Geometric Shapes Icon
Service:
Structural, Civil
Pie Chart Icon
Industries:
Commercial
Material Shapes Icon
Primary Material:
Concrete

Project Highlights

  • Utilized tilt-up concrete exterior walls with metal deck over open-web steel joist roof system.
  • The brick inset was recessed into the concrete panel above the window to create the architectural illusion of a brick corbel at each window.
  • Required off-site infrastructure improvements, such as the widening of Trent Avenue (State Highway 99) from Hogan Street to Erie Street; the design and installation of approximately 1,300 linear feet of new 12” water mainline and about 330 linear feet of new 8” water mainline; and Perry Street road improvements north of Trent Avenue.

Latest work

See all
Four106 MUST CREDIT Sozinho Imagery OK 20
project

Four106

Edgeworks Climbing Gym Crossroads Mall OK 7
project

Edgeworks TI at Crossroads Mall

WSU CC Interiors Branding Page 11
project

Washington State University Champion's Center