Juvenile Fish Facility Floor Screen Cleaner

Taking Care of our Rivers: Juvenile fish facility gets revised equipment

The US Army Corps of Engineers - Walla Walla District awarded a contractor to upgrade a juvenile fish facility located at the Lower Granite Lock and Dam. The contractor tapped DCI Engineers’ industrial structural team to analyze the existing facility members supporting the machinery and its connections. DCI developed the fabrication and construction documents to relocate three floor screen cleaners. The relocation of the equipment involved eliminating framing beams under the west motor mount, revising base plates, and analyzing the structure for loads imparted by the drive system.

Location Pin Icon
Location:
Pomeroy, Washington
Geometric Shapes Icon
Service:
Industrial
Pie Chart Icon
Industries:
Industrial
Material Shapes Icon
Primary Material:
Steel

Project Highlights

  • Fish facility equipment collects migrating juvenile salmon and steelhead to be transported downstream of the Snake River.

Latest work

See all
Esto 2023 LS73 001
project

Sacajawea Middle School

2023 August Swinerton The Current EDITED 9 web
project

The Current, River North

Bellingham Admin Building web Ben Benschnieder MUST CREDIT 3
project

Bellingham Public School District