Work

Lockwood High School

Lions Lair: New high school for the Lockwood community

Lockwood High School is a newly constructed 150,000-sf school facility, which includes a common area, three-story classroom wing, auditorium, tournament gym (with a mezzanine level), practice gym, and two-story locker room space. DCI Engineers designed the primary gravity and lateral structural systems for the main school and detached education buildings. The main building’s gravity resisting system comprises of concrete over metal decking which is supported by steel open web joists, structural steel beams and columns. Lockwood High School has capacity for 700 students.

Location Pin Icon
Location:
Lockwood, Montana
Building Icon
Stories:
2-3
Geometric Shapes Icon
Service:
Structural
Pie Chart Icon
Industries:
PK-12, Sports
Material Shapes Icon
Primary Material:
Concrete, Steel

Project Highlights

  • To reduce steel tonnage for the main building, the engineers reinforced floor beams and girders with composite welded studs.
  • For Lockwood Stadium, the team designed the foundation system for the grandstands, concession stand, and facility buildings. The stadium has capacity for 4,500 spectators.
  • High school also features detached education spaces, such as a 1,500-sf greenhouse and 4,500-sf vocational agriculture building.

Latest work

See all
Avenue Bellevue Drone Jan 2023 6 web
project

Avenue Bellevue

Panda Lantern Festival CAEG OK 6
project

Hello Panda Lantern Festival

Bright n Green Scarano Architects OK 2
project

Bright 'n Green