Work

LSIT VESSEL & PLATFORM

Treating Nuclear Material: Framing designed for large scale test vessel

The general contractor selected DCI to be the structural engineer of record in analyzing multiple structures and designing the final steel frame platform supporting a 14-ft large scale integrated testing (LSIT) vessel, process pipping, mixers, jib crane, and other process equipment. The facility was designed to aid with analyzing techniques for treating nuclear waste material. The engineering team compiled the construction documents for the framing system which was installed in a high-bay facility outfitted with other testing assemblies.

Location Pin Icon
Location:
Richland, Washington
Geometric Shapes Icon
Service:
Industrial
Pie Chart Icon
Industries:
Industrial
Material Shapes Icon
Primary Material:
Steel

Latest work

See all
Northlake Commons 04
project

Northlake Commons

Kettner2 Web
project

2100 Kettner

Good Shepherd Rehabilitation
project

Good Shepherd Rehabilitation Network – Center Valley