LSIT VESSEL & PLATFORM

Treating Nuclear Material: Framing designed for large scale test vessel

The general contractor selected DCI to be the structural engineer of record in analyzing multiple structures and designing the final steel frame platform supporting a 14-ft large scale integrated testing (LSIT) vessel, process pipping, mixers, jib crane, and other process equipment. The facility was designed to aid with analyzing techniques for treating nuclear waste material. The engineering team compiled the construction documents for the framing system which was installed in a high-bay facility outfitted with other testing assemblies.

Location Pin Icon
Location:
Richland, Washington
Cube Measurments Icon
Area:
14-foot
Geometric Shapes Icon
Service:
Industrial
Pie Chart Icon
Industries:
Industrial
Material Shapes Icon
Primary Material:
Steel

Latest work

See all
MHA Housing
project

Maniilaq Employee and Patient Housing Facilities

Villas on 24th LR MUST CREDIT Chase Daniel 9
project

Villas on 24th

Rocky Mountain Ranch aka Reed Residence MUST CREDIT LUCY CALL DO NOT SHARE 3 web size
project

Rocky Mountain Ranch