Work

Northlake Commons

Restorative Workplace: Healthy and sustainable office building harnesses mass timber biophilia

This sustainable office podium in South Lake Union exemplifies a progressive, healthy workplace environment for life science and commercial businesses alike. A generous 65,000-sf of outdoor programming is integrated through exterior breezeways, green spaces and private decks. For the interiors, exposed mass timber structure promotes biophilic benefits. The lower two levels are lab-ready spaces designed to meet anticipated floor load and vibration requirements. The upper floors were designed for standard office floor loading and can be upgraded for higher load and vibration requirements where needed.

DCI Engineers worked with the architect to detail the mass timber’s mortise and tendon pieces to accomplish a “goal post” design, which offered a seamless, connected look with the beams and columns.

Location Pin Icon
Location:
Seattle, Washington
Cube Measurments Icon
Area:
250,000-sf
Building Icon
Size:
4 & 5 stories
Geometric Shapes Icon
Service:
Structural
Pie Chart Icon
Industries:
Construction Engineering, Life Science & Laboratory, Mass Timber, Sustainable Design
Material Shapes Icon
Primary Material:
Concrete, Wood
Sustainability Icon
Sustainability:
LEED Platinum
Mass20 Timber20cover20photo

WoodWorks Case Study for Northlake Commons

Northlake Commons’ dramatic architecture prioritizes natural elements, leveraging biophilic design principles and using wood to inspire innovation and promote well-being.

Project Highlights

  • Achieved LEED CS Platinum
  • Pursuing Fitwel Certification
  • Includes 27,000-sf of warehouse space and 9,500-sf of retail space.
  • By installing pre-shaped mass timber columns and beams, construction time was reduced.
  • Conducted a vibration study for lab floor space performance.
  • The building includes open-air skybridges.
  • Four levels of below-grade parking.
Harry Rodin III web

Harry Rodin III

Senior Project Manager

PE

Latest work

See all
Almira K 8 MUST CREDIT PATRICK MARTINEZ 6
project

Almira K-8 School Replacement

W 27th St GE T Architects Rendering OK 4
project

West 27th Street

Gibson Guitar Zakara Photography Low Resolution Image 01
project

Gibson Acoustic