Work

Providence/Swedish Edmonds Parking Garage

The garage is the critical next step in this phase of our expansion and will pave the way for construction of our new emergency and urgent care facility.”

– Steve Kaiser, Swedish/Edmonds Director of Communications

Providence/Swedish Edmonds Parking Garage: Accommodations to Better Serve Patients

In recent years, the customer base for Edmonds hospital doubled in size and a facility expansion was prioritized. Part of the $63.4M expansion budget went into Phase 1 which included the construction of a brand new three-level parking garage with 365 car stalls. DCI’s general construction support services comprised of determining live and dead loads for the structure; calculating pier forces and shear friction; designing footings; providing alternative details for concrete elements; verifying dimensions, elevations, and capacity; and responding to permit requirements. The construction schedule was completed within five months.

Location Pin Icon
Location:
Edmonds, Washington
Cube Measurments Icon
Square Feet:
114,000
Building Icon
Stories:
3
Geometric Shapes Icon
Service:
Structural
Pie Chart Icon
Industries:
Parking
Material Shapes Icon
Primary Material:
Concrete, Steel, Masonry

Project Highlights

  • 365 parking stalls
  • Took five months to complete the construction schedule
  • Includes post-tension cast-in-place concrete slabs, cold-formed steel framing, masonry, composite and non-composite steel floor decks.

Latest work

See all
Baumberger Studio Final 2022 0321
project

Timberview VIII

Avenue Bellevue Drone Jan 2023 6 web
project

Avenue Bellevue

Panda Lantern Festival CAEG OK 6
project

Hello Panda Lantern Festival