Work

Pullman High School

Bringing the Outside In: Connecting Pullman High students socially beyond media

For the Pullman High School reconstruction project, it’s all about connection: connection with fellow students and connection to the surrounding landscape, screen time not included. The $47 million project adds 126,000-sf of space and modernizes 47,000-sf of current space, creating a new layout that optimizes classroom daylight, window views and social gathering areas.

Additions include several classrooms, science labs and other collaboration spaces for the three classroom wings, which are oriented east-west, as well as courtyards between those wings. This layout provides optimal views of the stadium as well as sweeping panoramas of the Palouse hills beyond.

A central circulation spine runs the length of the three-level school and includes the central commons. An upper structural steel bridge suspended from the roof structure and spanning the central spine and commons area, connects two of the classroom wings, creating a multi-dimensional space of connectivity and movement.

The additions are structural framing including open web steel bar joists, wide flange steel girders and steel tube columns for the roof. DCI Engineers’ structural design service saw through several project challenges, including the slope of the site. The DCI solution? Use retaining walls for part of the building foundation system.

Location Pin Icon
Location:
Pullman, Washington
Cube Measurments Icon
Square Feet:
126,000
Building Icon
Stories:
1-3
Geometric Shapes Icon
Service:
Structural
Pie Chart Icon
Industries:
PK-12
Material Shapes Icon
Primary Material:
Concrete, Steel

Project Highlights

  • The building’s design and orientation mimics a view similar to driving down a rural southeast Washington highway – rolling hills eroded at the crest by wind at the road’s edge are the inspiration for the structure’s sloping walls.
  • A new bridge suspended from the roof connects the upper levels.
  • Several new commons areas, including a sculpture garden, creates social gathering opportunities.
  • The gymnasium remodel includes added steel framing, which accommodates the snow drift from taller, adjacent new construction.
  • Additional parking for students, staff and events opens on the north end of the building.
  • Athletic fields remain in their current locations, however there are improvements to the stadium, including artificial field surfacing and a new ticket/concessions/accessible restroom facility.

Latest work

See all
Avenue Bellevue Drone Jan 2023 6 web
project

Avenue Bellevue

Panda Lantern Festival CAEG OK 6
project

Hello Panda Lantern Festival

Bright n Green Scarano Architects OK 2
project

Bright 'n Green