UCC Danny Lang Center

The beautifully designed event center will also allow for the region’s wine industry to be showcased at the many conferences, receptions and other gatherings planned to stimulate economic growth in Southern Oregon.”

Michael Donovan quoted in an “Oregon Wine Press” article

Creating a Winery Learning Center: Providing structural solutions for this unique higher education facility

DCI Engineers provided structural engineering services for this new winery learning center at Umpqua Community College. It functions as a multi-level classroom, assembly area, and wine production and storage facility.

Location Pin Icon
Location:
Roseburg, Oregon
Cube Measurments Icon
Area:
21,900-sf
Building Icon
Size:
2 stories
Geometric Shapes Icon
Service:
Structural
Pie Chart Icon
Industries:
Higher Education
Material Shapes Icon
Primary Material:
Concrete, Steel, Wood

Project Highlights

  • Upper level is used primarily for education, administration, and hospitality functions, while the lower level is used for wine production and storage.
  • Lower level barrel storage, themed wine cave, and fermentation room is framed with concrete walls. The main floor is steel framed.
  • The exposed roof structure is framed with a heavy curved timber roof system.

Latest work

See all
Four106 MUST CREDIT Sozinho Imagery OK 20
project

Four106

Edgeworks Climbing Gym Crossroads Mall OK 7
project

Edgeworks TI at Crossroads Mall

WSU CC Interiors Branding Page 11
project

Washington State University Champion's Center