Work

DCI provided structural and miscellaneous steel detailing and connection design, including signed and sealed connection calculation packages for this climate-controlled, 131-ft tall (plus cellar) self-storage facility in Manhattan. The structural system consists of composite concrete on metal deck slabs supported by steel beams and columns and concentric braces are used for the lateral system. Total weight of the structural steel was approximately 600 tons.

Location Pin Icon
Location:
New York, New York
Cube Measurments Icon
Area:
88,630-sf
Building Icon
Size:
10 stories
Geometric Shapes Icon
Service:
Structural, Specialty Engineering
Pie Chart Icon
Industries:
Commercial
Material Shapes Icon
Primary Material:
Steel

Latest work

See all
Almira K 8 MUST CREDIT PATRICK MARTINEZ 6
project

Almira K-8 School Replacement

W 27th St GE T Architects Rendering OK 4
project

West 27th Street

Gibson Guitar Zakara Photography Low Resolution Image 01
project

Gibson Acoustic