Gambling Against the Clock: Building the Viejas Casino’s parking garage in time for the holidays

Located in Alpine, California, the Viejas Hotel and Casino’s sky bridged connected parking garage was under construction while still under design. DCI Engineers provided structural design for this 280,000-sf, four-story parking structure at the popular Orange County Viejas Casino and Hotel. This $12 million design-build project was completed on an aggressive six-month schedule due to needs of the connecting casino and hotel. The structure was completed with 850 stalls, three elevators, and two fully enclosed sky bridges that connect the parking garage to the casino and hotel. The hotel bridge was designed as a nine-foot wide, open steel truss pan, while the casino bridge is 13-feet wide, steel truss pan.

Location Pin Icon
Location:
Alpine, California
Cube Measurments Icon
Square Feet:
280,000
Building Icon
Stories:
4
Pie Chart Icon
Industries:
Parking
Material Shapes Icon
Primary Material:
Concrete, Steel

“It was a pleasure working with Stephen Campion and Steve Flint at Swinerton Builders on this parking structure. It took a collective effort from everyone to accomplish this project in record time.”

Jack Howard, DCI Engineers

Gambling Against the Clock: Building the Viejas Casino’s parking garage in time for the holidays

Located in Alpine, California, the Viejas Hotel and Casino’s sky bridged connected parking garage was under construction while still under design. DCI Engineers provided structural design for this 280,000-sf, four-story parking structure at the popular Orange County Viejas Casino and Hotel. This $12 million design-build project was completed on an aggressive six-month schedule due to needs of the connecting casino and hotel. The structure was completed with 850 stalls, three elevators, and two fully enclosed sky bridges that connect the parking garage to the casino and hotel. The hotel bridge was designed as a nine-foot wide, open steel truss pan, while the casino bridge is 13-feet wide, steel truss pan.

Project Highlights

  • Project had a difficult site with many existing utilities which could not be removed.
  • Project was layed out and designed with foundation permit issued in six weeks.
  • The parking garage was conceived and constructed in less than twelve months.

Latest work

See all
Avenue Bellevue Drone Jan 2023 6 web
project

Avenue Bellevue

Panda Lantern Festival CAEG OK 6
project

Hello Panda Lantern Festival

Bright n Green Scarano Architects OK 2
project

Bright 'n Green