Work

Bozeman High School

Academic Achievement: Renovated HS to accommodate more students

Once completed, the newly renovated Bozeman High School will accommodate a larger student population estimated by the school district. The $29.5M make-over project encompasses adding the structural systems for a reconfigured two-story commons area with a new entry, an auditorium with 750 seats, and a two-story Learning Community area.

DCI Engineers is the structural engineer of record for the renovation project. The project includes new floor plans and details, foundation plans, ceiling details, roof plans, and brace frame details to develop the new areas. For the building’s exterior design, structural steel framed walls will be inset from the metal stud framing, which allows for a metal “balloon” frame.

Location Pin Icon
Location:
Bozeman, Montana
Cube Measurments Icon
Square Feet:
97,608
Building Icon
Stories:
1
Geometric Shapes Icon
Service:
Structural
Pie Chart Icon
Industries:
PK-12, Mass Timber
Material Shapes Icon
Primary Material:
Concrete, Steel, Wood

Project Highlights

  • The Learning Community area will have 10 classrooms, two science labs, breakout areas, and teacher planning areas.
  • The school’s library will be relocated to the second floor.

Latest work

See all
Dameron Architecture Empirefirehouse2
project

Empire Engine House

0120 110 Madison 20140627 100311
project

110 Madison

Baumberger Studio Final 2022 0321
project

Timberview VIII