Work

Coeur d'Alene High School Renovation

More Room to Conquer: Vikings acquire competition-sized gym, more classrooms

Coeur d’Alene High School’s 2018 modernization and addition efforts were funded by a $35.5M bond measure. The renovation efforts encompassed expanding the classroom space, creating a competition-sized gym (3,000+ seats), new weight room, wrestling room, multi-purpose meeting room, updated track, and new lobby addition.

DCI’s structural team provided construction documents and services for the expansion, which encompassed a foundation, mezzanine framing, and roof framing plans, calculating snow drift loads, and providing framing details. DCI coordinated essential construction sequencing for the contractor to handle site logistics for the concrete tilt-up panels and instructions to brace existing building systems while new systems were constructed. For the entry area, the construction crew tore off some of the existing structure and built temporary shoring for construction to proceed.

Location Pin Icon
Location:
Coeur d’Alene, Idaho
Cube Measurments Icon
Square Feet:
31,550
Building Icon
Stories:
1
Geometric Shapes Icon
Service:
Structural
Pie Chart Icon
Industries:
PK-12, Mass Timber, Seismic/Adaptive Renovation, Sports
Material Shapes Icon
Primary Material:
Concrete, Steel, Masonry, Wood

Project Highlights

  • At the new gym entrance, a prominent V-shaped glulam structure is backlit with LED lights and symbolizes the school mascot, the Vikings.
  • The roof of the commons is constructed out of cross laminated timber (CLT).
  • Viking Court is now a competition-sized gym.

Latest work

See all
Baumberger Studio Final 2022 0321
project

Timberview VIII

Avenue Bellevue Drone Jan 2023 6 web
project

Avenue Bellevue

Panda Lantern Festival CAEG OK 6
project

Hello Panda Lantern Festival