Fast Cast Bridge System

Delivering fast transportation across the country

DCI worked with Premier Steel to develop the Fast Cast Bridge® system, a prefabricated composite steel and concrete bridge class box culvert following the Accelerated Bridge Construction (ABC) technology of AASHTO. To date, our team has worked with Premier Steel to install 30+ Fast Cast Bridges across the country, each with specific location considerations.

Location Pin Icon
Location:
Multiple Locations
Geometric Shapes Icon
Service:
Bridges
Pie Chart Icon
Industries:
Bridge
Material Shapes Icon
Primary Material:
Concrete, Steel

One such bridge included the replacement of the Old Morris Highway bridge—a multi-culvert structure—which had been washed out by flood damage on the Muscogee Reservation, located in Okmulgee County, Oklahoma. The replacement involved a new 40-foot span, two-lane, Fast Cast Bridge class box culvert design. The installation took just three days and won a Bridge Project of the Year award in 2025.

Madison Street Pedestrian Bridge from below

DCI's Bridge Group: Keeping America's Infrastructure on the Move

Swanson 920 itok Omc R7 Pp V

Kristopher R. Swanson

Principal, Austin

PE, SE

In this industry, your success is only limited by what you’re willing to accomplish.”

Latest work

See all
KANA Marketplace Exterior rendering 4
project

KANA Marketplace

BRH Behavioral Health Northwind Architects MUST Credit Northwind Architects 24
project

Bartlett Regional Hospital - Aurora Behavioral Health

Marcus Hook Distribution Center2
project

Marcus Hook Distribution Center