Photo by Ben Benschneider
Work

Gonzaga University John & Joan Bollier Center for Integrated Science & Engineering

Connecting the Campus: Gonzaga’s new Integrated Science and Engineering building connects the university’s STEM schools

The center will welcome in a new energy and vision for science, engineering, computer science, mathematics and neuroscience for the University and Spokane Region.
GU President Thayne M. McCulloh

The Integrated Science and Engineering building is a two-story, 82,000-sf building with classrooms equipped for labs, classrooms and engineering workshops/studios. The project helped connect the other STEM buildings on Gonzaga’s campus. DCI provided structural and civil engineering services for the project. Inside the building you’ll see open spaces and lounges for students, and lots of labs for psychology, math, electrical circuits, student project wet & dry labs, dynamics & vibration lab, and an innovation studio for first year engineering students.

Location Pin Icon
Location:
Spokane, Washington
Cube Measurments Icon
Square Feet:
82,679
Building Icon
Stories:
2
Geometric Shapes Icon
Service:
Structural, Civil
Pie Chart Icon
Industries:
Life Science & Laboratory, Higher Education, Sustainable Design
Material Shapes Icon
Primary Material:
Concrete, Steel

Project Highlights

  • The building’s skybridge was designed with moment frames for an easy connection to Hughes Hall directly across the street from the new ISE.
  • The roof was designed to support rows of solar panels.
DCI Justin2814 15 itok Dn G Gzd QR
people

Justin Cook

Gelhausen 920 itokx1 CY8f E6
people

Wade Gelhausen

Kelly20 Anderson Spokane itokl Ty SJQ Rv
people

Kelly Andersen

Related work

See all
NIC Meyer Health Sciences Bldg For Vault
project

North Idaho College Meyer Health & Sciences Building

University of Washington Benjamin Hall_1 s 0
project

University of Washington Benjamin Hall

Northwest University Health and Sciences Center_sm s 0
project

Northwest University Health and Sciences Center