Work

Happy Valley Elementary

The new school feels like something we built together.”

Katie Tully, Happy Valley Elementary School music teacher, to the Bellingham Herald

Happy by Design: Bellingham students & staff provide input on new elementary school

In the same year, Happy Valley Elementary students and staff said goodbye to their 60-year-old school building and said hello to their new home: a 53,000-sf, energy-efficient school. The design includes features suggested by school staff, teachers and students.

The wood-framed building is comprised of a dynamic center core, which includes administration offices, the library and the main entrance. This connects the “Academic Wing” to the “Activities Wing.” The gymnasium, lunchroom and music room are located in the north wing; and classrooms in the two-story south wing are grouped around an open shared learning area. The design allows for a more compact footprint while the wing separation encourages a collaborative environment without noise and activity distractions.

DCI Engineers provided the structural design services, which included open web wood joists spanning between the corridor and exterior walls for the second floor framing. This allowed the mechanical, electrical and plumbing to be routed into classrooms between trusses without compromising the 14-foot floor-to-floor ceiling height. And because of the sloping site, partial height concrete walls were used at the perimeter for below-grade areas.

Happy Valley Elementary School officially opened to students and faculty members on August 24, 2016.

Location Pin Icon
Location:
Bellingham, Washington
Cube Measurments Icon
Square Feet:
53,000
Building Icon
Stories:
1-2
Geometric Shapes Icon
Service:
Structural
Pie Chart Icon
Industries:
PK-12, Mass Timber
Material Shapes Icon
Primary Material:
Concrete, Steel, Wood

Project Highlights

  • 2-1/2” concrete topping slab in the corridors provides better exposed wearing surface, with architectural aesthetic.
  • Large roof slopes and angled walls provide unique architectural design.
  • Covered play area features exposed open web steel joists, supported by steel beams and columns.
  • Large hallway window allows students to observe the inner workings of building boiler room.
  • Wood framing was selected for its sustainability and provided an opportunity to tap local contractor expertise.

Latest work

See all
Baumberger Studio Final 2022 0321
project

Timberview VIII

Avenue Bellevue Drone Jan 2023 6 web
project

Avenue Bellevue

Panda Lantern Festival CAEG OK 6
project

Hello Panda Lantern Festival