Our goal is to provide projects that are aesthetic, and functional; with the goal of giving the students and teachers an environment in which they can excel.”

gLAs Archictects

Out With The Old, In With The New: Engineering innovative learning spaces for Madison Middle School

DCI Engineers provided structural engineering consultation to help develop a system of auger cast concrete piers for the construction of this 87,000-sf, two-story middle school, located in Eugene, Oregon. Due to the location of the structure in close proximity to a river, uneven subsurface conditions created a challenge for the construction of the foundation. DCI designed the auger cast concrete piers as they were the most cost-effective solution, offered quick installation, and avoided any disruption and expense of driven piles or deep over-excavation. DCI worked with a geotechnical consultation to help maintain architectural design while using straightforward construction and economical practices. Solving tricky site and foundation challenges like this is everyday work for DCI's school structural engineering team.

Location Pin Icon
Location:
Eugene, Oregon
Cube Measurments Icon
Area:
87000-sf
Building Icon
Size:
2 stories
Geometric Shapes Icon
Service:
Structural
Pie Chart Icon
Industries:
PK-12
Material Shapes Icon
Primary Material:
Steel, Masonry, Wood

Project Highlights

  • Auger cast pier foundation
  • Structural Steel floor framing
  • Engineered timber roof structure
  • Two gymnasiums
  • Student enrollment – 475

Latest work

See all
Pokemon OK to Use 1
project

Pokémon International Office

Pages from 230331 Village DD Pricing Set Combined 4
project

The Village SF Wellness Center

Eastrail Flats MUST CREDIT Main Street Property Group 7
project

Eastrail Flats