NAC | Architecture Office Addition

Old Historic Building Meets New Modern Addition: Creating a new working space for an architectural client

DCI Engineers provided structural design services for the NAC|Architecture Office Building Addition, which connects to the firm’s original historic brick building. The project earned a LEED Silver rating by daylight harvesting, solar controlled blind systems, and the use of high recycled content and low-emitting materials.

Location Pin Icon
Location:
Spokane, Washington
Cube Measurments Icon
Square Feet:
10,000
Building Icon
Stories:
3
Geometric Shapes Icon
Service:
Structural
Pie Chart Icon
Industries:
Commercial
Material Shapes Icon
Primary Material:
Concrete

Project Highlights

  • The structure has several features that challenged the design team, including 9’ cantilevered slabs, zero offsets at the property lines, and large skylights in the building’s roof.
  • Consists of 7” deep post-tensioned slabs and 14” slab beams that are support by cast-in-place concrete columns and walls.
  • Post-tensioned concrete was chosen for the design in order to minimize structural depths, so that the floor-to-floor heights could be matched to the existing building.

Latest work

See all
Esto 2023 LS73 001
project

Sacajawea Middle School

2023 August Swinerton The Current EDITED 9 web
project

The Current, River North

Bellingham Admin Building web Ben Benschnieder MUST CREDIT 3
project

Bellingham Public School District