Photo by Alex Nye
Work

Extreme Resilience: Navy's China Lake Station is built to last

This large-scale military construction project involved the replacement of facilities previously rendered unsafe by the 2019 Ridgecrest Earthquake. These structures have been designed to withstand the area's extreme forces, including 8.0-magnitude earthquakes, high winds, Class D exposure, flooding, noise pollution, high temperatures, and jet fuel.

Location Pin Icon
Location:
Ridgecrest, California
Cube Measurments Icon
Area:
75,800-sf
Building Icon
Size:
2 stories
Geometric Shapes Icon
Service:
Structural
Pie Chart Icon
Industries:
Government & Municipal
Material Shapes Icon
Primary Material:
Concrete

The project included an Integration Laboratory, a 75-sf research, development, and testing facility comprised of cast-in-place concrete tilt-up panels with formliner banding, aluminum storefront systems, and composite metal decking; an Integrated Air Operations and Tower Facility, with a 158-foot-tall ATC tower and administrative footprint of 17,000-sf; and a Structural/Aircraft Fire and Rescue Station, which totals 20,000-sf and includes a kitchen, parking bays, and dormitories.

Latest work

See all
URBY Dallas Construction Images Erin Oct 2023 15
project

Dallas Urby

Milwaukee Station2025 14
project

The Station Lofts

Katy Trail Condos 4 MUST CREDIT Chase Daniels medium
project

The Terminal at Katy Trail