Spokane International Airport Parking Operations Building

Completely Operational: Parking team gets new central nerve center

A single-story parking operations building was constructed at the Spokane International Airport to serve as the main service center for the parking facility department. The 3,800-sf facility includes office space, training rooms, and a service center. There is a separate CMU garage for parking snow removal vehicles and shuttles, plus another building equipped with a single-bay drive-thru car wash. DCI was the engineer of record for this development and designed the foundation, mechanical platform framing, and roof framing plans.

Location Pin Icon
Location:
Spokane, Washington
Cube Measurments Icon
Area:
8,000-sf
Building Icon
Size:
1 story
Geometric Shapes Icon
Service:
Structural
Pie Chart Icon
Industries:
Government & Municipal
Material Shapes Icon
Primary Material:
Concrete, Steel, Wood

Project Highlights

  • A mechanical platform in the garage hides mechanical units rather than installing them on the roof.
  • The engineering team detailed sloping, exposed glulam beams for the interior roofline.

Latest work

See all
KANA Marketplace Exterior rendering 4
project

KANA Marketplace

BRH Behavioral Health Northwind Architects MUST Credit Northwind Architects 24
project

Bartlett Regional Hospital - Aurora Behavioral Health

Marcus Hook Distribution Center2
project

Marcus Hook Distribution Center