Vanguard Academy

Real World Learning: Moses Lake school offers project-based learning

involving collaborative group learning and a focus on professional trade skills. Instead of traditional classrooms and corridors, the facility includes an interactive commons area called the Marketplace for seminar-type learning, which can be modified into smaller “breakout” spaces. The second floor includes a music lab, arts studio, and fitness area. The academy can accommodate 700 to 900 students.

Location Pin Icon
Location:
Moses Lake, Washington
Cube Measurments Icon
Square Feet:
134,000
Building Icon
Stories:
2
Geometric Shapes Icon
Service:
Structural
Pie Chart Icon
Industries:
PK-12
Material Shapes Icon
Primary Material:
Concrete, Steel

Project Highlights

  • Steel braced frames create long-span open areas for the school’s Marketplace and shared common spaces.
  • When the design for the second floor changed to include large tiles, the engineers modified the floor design to accommodate loads for the added weight of leveling compound.
DCI Crow0678 web itokn4 Zg NTTS

Craig T. Crowley

COO/Principal, Spokane

PE, SE, LEED AP

I’ve always appreciated the ‘work hard/play hard’ mentality at DCI, the team approach to determining innovative and cost-effective design and helping our clients achieve successful projects. I also cherish the many friendships that I’ve been so lucky to find with our clients, employees, and other consultants within the construction industry.”

Related work

See all
Gallatin High School_ High20 Resolution20 20 Web20 Image2001 0
project

Gallatin High School

Lockwood High School_LHS 73
project

Lockwood High School

Quincy High School_DJI 0808 0
project

Quincy High School