811 Stark

Heavy timber and concrete podium defines new urban neighborhood aesthetic

Portland’s Central Eastside Industrial District has a new mixed-use commercial building embedded into the neighborhood. The 811 Stark building is a four-story podium with one concrete floor of retail and parking and three above-grade office levels framed with glulam post and beams. DCI Engineers reviewed calculations and connection details for the primary glulam post and beam structural system, which are exposed for the interior office finish.

Location Pin Icon
Location:
Portland, Oregon
Cube Measurments Icon
Area:
31000
Building Icon
Size:
4
Geometric Shapes Icon
Service:
Structural
Pie Chart Icon
Industries:
Commercial, Mass Timber
Material Shapes Icon
Primary Material:
Steel, Masonry, Wood

Project Highlights

  • Exposed glulam posts and beams emphasize Portland’s well-known wood product industry – an expectation from the Portland Central City Design Board.
  • Floor-to-ceiling windows.
  • Open floor plans for office levels.
  • Ground floor retail and streetscape reinforces vibrant pedestrian activity.
  • Rooftop deck.

Latest work

See all
MHA Housing
project

Maniilaq Employee and Patient Housing Facilities

Villas on 24th LR MUST CREDIT Chase Daniel 9
project

Villas on 24th

Rocky Mountain Ranch aka Reed Residence MUST CREDIT LUCY CALL DO NOT SHARE 3 web size
project

Rocky Mountain Ranch