Fifteen Fifty

A San Francisco First: Mixed-use towers with PBD concrete shear wall system

A major thoroughfare of downtown will soon be activated with a dual-use office and residential tower complex called Fifteen Fifty. Named for having many moving parts to the development, Fifteen Fifty incorporates new buildings with the existing façade of the former Coca Cola Bottling Plant. Part of a 14-square block area under redevelopment, Fifteen Fifty reimagines the urban intersection as a bustling workplace for professionals and home to city dwellers. The complex will include a 39-story tower with 984 residential units and a 16-story office tower, where the San Francisco Planning, Building, and Public Works Departments will soon reside. Fifteen Fifty will make the Van Ness corridor into a destination, thus amenities will include subterranean parking, retail space, sky gardens, a central plaza, playground, and pedestrian connections.

DCI Engineers applied Performance Based Design (PBD) methodology to achieve the most efficient design possible for Fifteen Fifty by using high-strength (80 KSI) reinforcement in the vertical steel of the shear wall boundary elements. As a result, more than $1,000,000 worth of reinforcing was eliminated from the material cost (since the amount of reinforcing needed was reduced by 1/3). DCI is the first engineering firm in the City of San Francisco to utilize high-strength reinforcing for this purpose in the U.S.

Location Pin Icon
Location:
San Francisco, California
Cube Measurments Icon
Square Feet:
12,000,000
Building Icon
Stories:
16-39
Geometric Shapes Icon
Service:
Structural
Pie Chart Icon
Industries:
Commercial, High Rise / Performance Based Design, Multi-Family Residential, Sustainable Design
Material Shapes Icon
Primary Material:
Concrete, Steel

Project Highlights

  • Both towers contain Performance Based Design (PBD) lateral concrete shear wall systems with Grade 80 vertical reinforcement developed by DCI Engineers. Fifteen Fifty is the first development built with these systems in a high-seismic U.S. region.
  • The office tower was constructed with large floor plates, as desired by the City of San Francisco.
  • The shape of the tower, tower rotation, canopy shape, and landscaping layout were designed and arranged to meet San Francisco’s wind ordinance.
  • Fifteen Fifty integrates a historic clock tower and building façade from the existing Coca-Cola building.
  • Subterranean parking levels comprises of 256 stalls.

First 80 ksi reinforced high-rise in the U.S.


DCI was the first engineering firm in the country to develop parameters and detailing rules for incorporating high-strength reinforcing in shear walls (80 ksi) for a building located in a high seismic region.


The code limit for high-strength vertical reinforcement in shear walls at the time of design was 60 ksi.


The engineering team coordinated low cycle fatigue testing of the 80 ksi rebar to confirm the reinforcement met strength parameters. New rules were developed for tie confinement spacing as a result of the testing.

Fifteen Fifty_O Rear MUST CREDIT 3

Using higher strength reinforcing reduces the area of reinforcing required to provide the same level of strength. Less area reduces the overall material, and thus reduces the carbon footprint of the building, saving material and labor with fewer pieces to build. Fifteen Fifty's shear wall system is a mixture of Grade 80 and Grade 60 reinforcing. Using Grade 80 reduced shear wall congestion and made for easier construction in the lower half of the buildings. Spacing and size rules sometimes govern minimum reinforcing area, usually higher up in the building where demands are lower, and Grade 60 is more appropriate. The City of San Francisco Department of Building Inspection's new headquarters building could remain serviceable after an extreme seismic event so the facility can be used during emergencies to help bring critical functions of the city government back on-line faster. By using 80 ksi vertical reinforcement, more than $1,000,000 worth of reinforcing was eliminated from the material cost (since the amount of vertical reinforcing needed was reduced by 25%)

People

Roger27s20 Fav cropped web itok PA Yfh V Pc
people

Roger L. Heeringa

Scott Erickson cropped
people

Scott D. Erickson

Latest work

See all
Baumberger Studio Final 2022 0321
project

Timberview VIII

Avenue Bellevue Drone Jan 2023 6 web
project

Avenue Bellevue

Panda Lantern Festival CAEG OK 6
project

Hello Panda Lantern Festival