Work

Google Phase II

Flexible Designs For Future Generations: Making a state-of-the-art office space that can be easily converted for future tenants

The second phase of Google’s Kirkland Campus exemplifies DCI Engineers’ ability to provide efficient structural designs that allow for flexibility of future uses. Maintaining maximum flexibility of the end design was a key goal for the project. To this end, DCI utilized slab bands and wide shallow beams in the design, creating an open 30-ft by 44-ft column spacing that allows for a wide range of future uses. A large plaza level over the parking garage is currently utilized as a pedestrian courtyard, but was designed to support truck traffic and could be converted into another parking level in the future.

Location Pin Icon
Location:
Kirkland, Washington
Cube Measurments Icon
Square Feet:
456,000
Building Icon
Stories:
2
Geometric Shapes Icon
Service:
Structural
Pie Chart Icon
Industries:
Commercial
Material Shapes Icon
Primary Material:
Concrete, Steel

Project Highlights

  • A covered, 190-ft pedestrian bridge connects second phase of the project to the first phase, located on the other side of a City of Kirkland transit right of way that splits the campus and is earmarked for future light rail.
  • The bridge consists of two steel curved girders supported on steel columns with spans up to 55 feet.
  • The building features 190,000-sf of office space on two levels, as well as 276,000-sf of parking on two levels above and below-grade, providing space for up to 1,000 new employees.

Latest work

See all
Baumberger Studio Final 2022 0321
project

Timberview VIII

Avenue Bellevue Drone Jan 2023 6 web
project

Avenue Bellevue

Panda Lantern Festival CAEG OK 6
project

Hello Panda Lantern Festival