Work

James Bowie High School

Investing in Austin’s Education: School modernization effort to increase capacity

The James Bowie High School modernization project will increase student capacity and add a competitive gym, practice gym, weight training/equipment room, locker and dressing rooms, athletic offices, and event-day space. LAM+DCI designed the primary structural systems for the project, which include composite steel floor framing, steel roof girders to support bidder-designed roof joists, steel lateral brace frames, and shallow foundation elements. LAM+DCI collaborated with the geotechnical engineer and general contractor to reconcile varying foundation system recommendations in the preliminary and final reports.

Location Pin Icon
Location:
Austin, Texas
Cube Measurments Icon
Square Feet:
97,406
Building Icon
Stories:
1-2
Geometric Shapes Icon
Service:
Structural
Pie Chart Icon
Industries:
PK-12, Sustainable Design
Material Shapes Icon
Primary Material:
Concrete, Steel, Masonry

Project Highlights

  • The project team succeeded in determining design properties for a cost-effective shallow foundation system.
  • The project team resolved impervious cover restrictions, phasing challenges, and coordinated construction activity during regular campus operation hours.

Awards and Certifications

  • LEED Silver
  • AEGB 4-Star Rating
Swanson 920 itok Omc R7 Pp V
people

Kristopher R. Swanson

Melissa Sibley Austin web
people

Melissa Sibley

Latest work

See all
Dameron Architecture Empirefirehouse2
project

Empire Engine House

0120 110 Madison 20140627 100311
project

110 Madison

Baumberger Studio Final 2022 0321
project

Timberview VIII