Work

Nu Skin Provo Campus Expansion

Designing a "Nu" facility for the Nu Skin Headquarters: Engineering a world-class facility to reenergize downtown Provo, Utah

DCI Engineers provided the structural engineering design for this five-project expansion which includes the construction of a new, approximately 200 stall, single story, underground parking garage on the north side of West 100 South Street. A new garden and plaza area will be constructed over the garage lid to enhance the overall campus and provide a connection to the existing LDS church to the east. The building was also designed with a double glass wall ventilated façade on the second floor to keep it cooled in the hot summer and warm in the cold winters and there will be reflecting pools around three sides of the building, so it will give the feeling of the building being on an island of sorts.

Location Pin Icon
Location:
Provo, Utah
Cube Measurments Icon
Square Feet:
20,000
Building Icon
Stories:
2
Geometric Shapes Icon
Service:
Structural
Pie Chart Icon
Industries:
Commercial
Material Shapes Icon
Primary Material:
Concrete, Steel

Project Highlights

  • Supported laterally in one direction by a single concrete shear wall that sits on a post-tensioned concrete transfer beam spanning over the below grade garage below.
  • In the other direction, the lateral system consists of long span (60ft) “special steel truss moment frames” supported by concrete filled pipe columns.
  • The special steel truss moment frame system provides for an airy and open structure that allows you to see through the entire building.

Latest work

See all
Esto 2023 LS73 001
project

Sacajawea Middle School

2023 August Swinerton The Current EDITED 9 web
project

The Current, River North

Bellingham Admin Building web Ben Benschnieder MUST CREDIT 3
project

Bellingham Public School District